FITT Bluforce preserves the quality of the water in the Assergi spring

Product:
FITT Bluforce DN125 PN16

Technology:
Traditional trench laying

Location:
Gran Sasso spring in the Assergi area (AQ)

Date carried out:
03/2019

Delivery:
Variable flow rate between 450 and 600 L/s

Bypass delivery rate:
15 L/s

Storage capacity:
24,000 sqm

Annual output:
20 mln sqm

Site goal:
Creation of a 800 mt bypass from the main pipe (steel DN800) within the spring.

 

 