Are you interested in a supply?
Request the price list
"*" indicates required fields
Product:
FITT Bluforce RJ
Technology:
Horizontal Directional Drilling (HDD)
Location:
Municipality of Bagnacavallo (RA)
Commissioning:
09/2019
Building contractor:
DIM Group
Utility:
Gruppo HERA
Site goal:
Water network renovation
Water network renovation:
8 meters
Total length:
1200 meters
Single pull length:
from 180 to 265 meters
Total pulls:
6
Pulling force:
from 4,5 to 5,5 tons (44 kN to 54 kN)
Implementation time:
6 days
"*" indicates required fields